A full kitchen remodel replaces everything you can see and most of what you cannot: cabinets, counters, flooring, lighting, appliances, and the wiring, plumbing and drywall behind them. In San Jose it usually costs between $60,000 and $150,000, needs a City building permit and inspections, and takes two to four months of construction.
When a full remodel is the right call
Not every dated kitchen needs to be gutted. A full remodel earns its cost when several of these are true at once:
- The layout fights you. The refrigerator door hits the dishwasher, two people cannot pass at the sink, or the only counter next to the range is eight inches wide.
- The cabinet boxes are failing. Particleboard bottoms have swollen near the sink, face frames are separating, or drawers have no full-extension slides and never will.
- The systems are tired. You have ungrounded two-prong outlets, a 100-amp panel with no open spaces, galvanized supply lines with weak pressure, or a range hood that vents into the cabinet above it.
- You want something the room cannot do today. An island, a wall oven stack, a walk-in pantry, or an opening to the family room.
If only the surfaces bother you and the bones are sound, a kitchen refresh or refacing can deliver most of the look for a fraction of the money. We will tell you honestly which camp you are in.
What is included in a full kitchen remodel
A typical gut remodel in a San Jose single-family home runs through these trades, roughly in this order. Your bid should list each one so you can compare apples to apples.
| Phase | What happens | Who does it |
|---|---|---|
| Design and measure | Field measurements, layout drawings, cabinet elevations, finish selections | Designer or design-build remodeler |
| Permits | Minor remodel permit online, or major remodel plan review if walls or fixtures move | Contractor, usually |
| Demolition | Cabinets, counters, flooring, drywall and old fixtures removed; debris hauled | General contractor crew |
| Rough-in | New circuits, outlets, lighting boxes, supply and drain lines, gas or 240V range feed, hood duct | Licensed electrician, plumber, HVAC |
| Inspections | Rough electrical, plumbing and framing inspections before walls close | City of San José inspectors |
| Close-up | Insulation where exposed, drywall, texture, prime | Drywall crew, painter |
| Cabinets | Set, level and fasten boxes; install fillers, panels and crown | Cabinet installer |
| Counters | Template after cabinets are set, fabricate in about one to three weeks, install | Stone or surface fabricator |
| Finishes | Backsplash tile, flooring if not done earlier, paint, hardware | Tile setter, painter |
| Trim-out and final | Sink, faucet, disposal, appliances, light fixtures, final inspection and punch list | All trades |
Behind the walls of an older San Jose kitchen
The surprises in a San Jose remodel tend to follow the age of the house. Knowing them ahead of time keeps your contingency realistic.
Homes built before 1950 in Willow Glen, the Rose Garden, Naglee Park and the Alameda corridor sometimes still have knob-and-tube wiring, galvanized water pipe and plaster-and-lath walls. Plaster demolition is dusty and slow, and any wiring that is opened up will be replaced to current code.
1950s and 1960s ranch homes in Cambrian, Blossom Valley, West San Jose and much of Almaden often sit on slab foundations with drains cast into the concrete. Moving a sink across the room may mean saw-cutting the slab and trenching a new drain, which adds cost and time. Many of these homes also have 100-amp panels that cannot take an induction range, a heat pump and an EV charger at the same time.
1970s through 1990s tract homes in Evergreen, Silver Creek, Berryessa and parts of Almaden Valley usually have better electrical service and crawlspaces or cleaner slabs, but often hide a ductwork soffit above the upper cabinets and a structural header over the kitchen window that limits how high you can go.
Any home built before 1978 may have lead-based paint. California requires lead-safe work practices when painted surfaces are disturbed, and the contractor should be certified under the EPA Renovation, Repair and Painting rule.

Full kitchen remodel cost in San Jose
Costs here are high because almost everything is high: skilled labor, disposal fees, permit fees and the time it takes trades to drive across the valley. Published data gives a sense of the spread. HomeAdvisor's San Jose figures show an average kitchen remodel around $45,700, but that average includes partial projects. Block Renovation's permit-based average is closer to $56,000. Remodelers who focus on full gut jobs in Silicon Valley, such as Revive, publish ranges of $125,000 to $350,000 for complete high-end kitchens, or roughly $350 to $600 per square foot of kitchen.
For a typical 150 to 200 square foot kitchen in San Jose, here is how full remodels tend to break down:
| Budget level | Typical total | What you get |
|---|---|---|
| Value full remodel | $55,000 – $80,000 | Stock or semi-custom cabinets, quartz, mid-range appliances, LVP or tile floor, same layout |
| Mid-range full remodel | $80,000 – $120,000 | Semi-custom or custom cabinets, better stone, induction or pro-style range, new lighting plan, minor layout tweaks |
| High-end full remodel | $120,000 – $200,000+ | Full custom cabinetry, quartzite or marble, panel-ready appliances, relocated plumbing or walls, architect involvement |
These are planning numbers drawn from those published sources and local bids we have seen, not a quote. Two kitchens of the same size can differ by $40,000 depending on what is behind the drywall and what you choose. Our cost guide breaks out cabinets, counters, labor and permits line by line.
Where the money goes
On most full remodels, cabinets and installation take the largest share, often 30 to 35 percent. Labor across all trades is the next biggest piece. Countertops, appliances and the electrical and plumbing rough-in each take a meaningful slice. Permits, design fees and debris disposal look small individually but add up to several thousand dollars together.
Get an itemized bid for your remodelFree in-home or video consult, an itemized written bid, no obligation.
San Jose permits for a full remodel
A full remodel that keeps the sink, range and dishwasher where they are can often go through San José's online minor kitchen remodel permit, which covers swapping fixtures and appliances in place, including new wiring, piping or ductwork, provided nothing structural changes. If you relocate or add fixtures, remove or add walls, change a window opening, or alter framing, the City treats it as a major remodel and requires plans and review. The permit guide explains both, plus what inspectors look for.
Under the 2025 California Energy Code, which applies to permits applied for on or after January 1, 2026, new kitchen lighting must meet high-efficacy and control rules, and the installer completes a lighting certificate for the inspector. A ducted range hood with a backdraft damper is the norm; one of the City's inspection checklists sets 100 cfm as the minimum for kitchen fans, vented outdoors.
Timeline: how long a full remodel takes
- Design and selections, two to six weeks. Faster if you arrive with a clear idea; slower if you are shopping slabs and appliances from scratch.
- Permit, one day to several weeks. Minor remodel permits can be issued online. Major remodels wait on plan review, which varies with City workload.
- Cabinet lead time, four to ten weeks. Semi-custom lines are faster; custom shops in the Bay Area often quote eight to twelve weeks.
- Construction, six to twelve weeks. Demolition and rough-in in the first two weeks, inspections, drywall, cabinets, counters about two weeks after cabinets are set, then tile, trim-out and final.
The smartest scheduling trick is to order cabinets before demolition so the room is not sitting empty while you wait.
Choosing who does the work
A full kitchen remodel needs a general contractor (CSLB "B" license) or a specialty contractor working within the scope of their license, plus licensed electrical and plumbing work. California holds deposits to $1,000 or 10 percent of the price, whichever is lower, and progress payments should follow completed work. Ask every bidder for their license number, proof of insurance, who pulls the permit, how they protect the rest of the house from dust, and what allowances are included for items you have not chosen yet.
When you request a quote here, we send your project to one remodeler who handles full kitchens in your part of San Jose. They visit, measure, and give you a written, itemized bid. If it is not right, you owe nothing.